• UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 6:28 p.m.Estimated time of restoration: Not yet determined Affected Areas: Municipalities of ANILAO, BANATE, BAROTAC VIEJO and SAN RAFAEL Cause of interruption: Load shedding of the transmission provider, National Grid Corporation of the Philippines (NGCP) Our Technical Team is closely coordinating with NGCP for the updates and estimated time of power restoration.… Read more

  • UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 1:28 p.m.Estimated time of restoration: Not yet determined Affected Areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, SARA, SAN DIONISIO, CONCEPCION, AJUY, LEMERY, BATAD, ESTANCIA, BALASAN, and CARLES Cause of interruption: High system voltage of Panay Grid transmission line operated by the National Grid Corporation of the Philippines (NGCP)… Read more

  • UNSCHEDULED POWER INTERRUPTION UPDATEAs of 12:45 PM, February 20, 2023 (Monday)

    For your information. Read more

  • ILECO III ENERGY SAVING TIPS

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • NOTICE TO THE PUBLIC

    Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more