• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 1, 2023)

    Date: February 01, 2023 (Wednesday) Time of interruption: 2:00 PM Time of restoration: 3:10 PM Affected area: Poblacion, Anilao, Iloilo (portion) Activity: Installed correctional pole We apologize for the inconvenience. For your information. Read more

  • THERMAL SCANNING OF DISTRIBUTION LINES

    ILECO III Technical Team conducted Thermal scanning of Distribution Lines to determine hotspots of distribution lines and to reduce system loss today, January 31, 2023 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 31, 2023)

    Date: January 31, 2023 Time of interruption: 11:30 AM Time of restoration: 3:25 PM Affected area: Trinidad Village, Poblacion, Barotac Viejo, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • LOVE MONTH NA!

    Do you know someone who deserves some love? Visit the post below on ILECO III Official Facebook Page and follow the instructions: https://www.facebook.com/ILECO3/posts/pfbid02uPeWT17NzDGZHobRFMpKatSpiyn3U7e2PeW8iDgJKcgKR6ePaaToXUCL6AaWwqhWl Step 1. Share with us below the picture of your loved one/s.Step 2. Tag/mention him/her and tell us one special thing about him/her.Step 3. Use the #ILECO3ISLOVE in your caption for your entry to… Read more

  • ENERGY SAVING TIP

    Use smart automated devices. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more