• SCHEDULED POWER INTERRUPTION SA OKTUBRE 9-13 KAG 17, 2023 SA BANWA SANG SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod: OKTUBRE 09, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sitio Gubhan, San Luis OKTUBRE 10,… Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: October 3, 2023 (Tuesday) Time of interruption: 7:45 AM Estimated time of restoration: 9:07 AM Affected Area/s: Apelo, Sara Activity: Inspection of line and repaired secondary neutral cut-off of transformer bushing We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA OKTUBRE 6, 2023 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 06, 2023 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: • Poblacion (portion)• Bularan (portion)• Talokgangan• San… Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa publiko nga sugod sa Pebrero 01, 2023 (Miyerkules) pagakwa-on na sang ILECO III ang tanan nga mga unauthorized cable wires sang mga unlicensed Telco/Internet Providers nga naga-attach sa poste sang ILECO III nga wala sang pahanugot halin sa aton kooperatiba bangud isa ini ka rason sang unscheduled power interruptions nga nagaluntad sa aton… Read more

  • ILECO III DONATED ELECTRIC FANS TO ELEMENTARY SCHOOLS OF SAN DIONISIO, ILOILO

    Through the efforts of Dir. Vincent H. Belita (Board of Director- District III, San Dionisio and Concepcion), ILECO III turned-over twenty four (24) stand fans to all elementary schools in San Dionisio, Iloilo on February 1, 2023 (Wednesday). Engr. Belita also give his message informing the educators of the present power industry set-up. He also… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more