
POWER RATES
POWER ADVISORIES
SARA SUBSTATION BANATE SUBSTATION DAAN BANWA AJUY SUBSTATION NATIVIDAD SUBSTATION was de-energized due to NGCP shutdown. ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. Power restoration to affected areas is not yet determined. We apologized for the… Read more
Power were restored in: ANILAOBANATEBAROTAC VIEJOSAN RAFAEL Additional power restored in: SAN DIONISIOLEMERY PORTION OF SARA While Daan Banwa Substation Feeder 1 was de-energized at around 11:19 PM due to Manual Load Dropping. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of… Read more
Date: April 28, 2023 (Friday) Time of interruption: 11:19 PM Affected areas: Feeder 1-Daan Banwa Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more
Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more
Sa bulan sang Enero 2023, ang ILECO III may ara sang pinakanubo nga system loss nga 3.30% sa bilog nga Western Visayas. Ini mas manubo sa National Ceiling Standard sang Energy Regulatory Commission (ERC) nga indi magsobra sa 10.25% nga gina-pass-on sa mga miyembro konsumidores. Ang pagnubo sang aton system loss ang resulta sang padayon… Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more