
POWER RATES
POWER ADVISORIES
Date: July 08, 2023 (Saturday) Time of interruption: 8:41 PM Time of restoration: 9:13 PM Affected areas: Sara Feeder 2 Cause of power interruption: Damaged pin insulator in Poblacion Market, Sara, Iloilo We apologize for the inconvenience. For your information. Read more
Keep safe Warriors of Light! For your information. Read more
Pahibalo sa mga katapo-konsumidores nga ang BRGY. POBLACION ILAWOD KAG BRGY. PADIOS, SARA ang nadala sa mga apektado nga lugar sa power interruption sa HULYO 08, 2023 (SABADO) 6:00 AM- 12:00 NN (6 ka oras ang kalawigon). Madamo gid nga salamat. Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. commemorate Evelio Javier Day, February 11, 2023. Read more
Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more
Sa bulan sang Enero 2023, ang ILECO III may ara sang pinakanubo nga system loss nga 3.30% sa bilog nga Western Visayas. Ini mas manubo sa National Ceiling Standard sang Energy Regulatory Commission (ERC) nga indi magsobra sa 10.25% nga gina-pass-on sa mga miyembro konsumidores. Ang pagnubo sang aton system loss ang resulta sang padayon… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more