• UNSCHEDULED POWER INTERRUPTION (MAY 2, 2023)

    Date: May 02, 2023 Time of interruption: 12:56 PM Time of restoration: 2:37 PM Affected area: Sitio Tuong, Pantalan, Carles, Iloilo Activity: Repaired secondary neutral jumper cut-off We apologize for the inconvenience. For your information. Read more

  • POWER ADVISORY

    NAHANUNGOD SA NAGA LAPTA NGA MESSAGE SA ATON NGA FB MESSENGER  Read more

  • POWER ADVISORY UPDATE as of 12:00 p.m., April 30, 2023

    Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more