• SCHEDULED POWER INTERRUPTION SA OKTUBRE 1, 2022 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa Oktubre 01, 2022 (Sabado), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon para sa pag-ubra sang Double Circuit line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa ginpatigayon nga on-going Banate Substation. Ang apektado nga lugar sang sini nga… Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 27, 2022)

    Date: September 27, 2022 Time of interruption: 10:20 AM Time of restoration: 10:50 AM Affected area: Poblacion, Ajuy, Iloilo Activity: Retirement of distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 22, 2022)

    Date: September 22, 2022 Time of interruption: 5:35 AM Time of Restoration: 6:16 AM Affected Area: Brgy. Zaragosa, Balasan Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • NERGY SAVING TIP

    Unplug devices when not in use. Read more

  • NOTICE TO THE PUBLIC

    Matapos ang ginhatag nga tyempo ukon plaso sa tanan nga unlicensed Telco/Internet Providers agud kuhaon ang mga un-authorized cable wires nga naga-attach sa poste kag naga-sablag sa linya sang kuryente , ang ILECO III Technical Team ang madinalag-on nga nagpatigayon sang “OPERATION BAKLAS” umpisa sang Pebrero 17–20, 2023. Ini nga lihok ang kabahin sang System… Read more

  • NGAA MAY POWER INTERRUPTION?

    Ang power interruption amo ang temporaryo nga pag-untat sang supply sang kuryente sa isa ka lugar ukon balay. May duha ka sahi sang power interruption: 1. NATALANA (SCHEDULED) 2. WALA NATALANA (UNSCHEDULED) Mga rason nga-a may ara sang scheduled power interruption: • Pagkay-o sang makinaryas• Pagkay-o kag pagmentinar sang linya sang kuryente• Line Clearing Activities•… Read more

  • ASH WEDNESDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observe Ash Wednesday, February 22, 2023. “For you are dust, and to dust you will return.” – Genesis 3:19 Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more