• UNSCHEDULED POWER INTERRUPTION

    Date: May 30, 2024 (Thursday) Time of interruption: 12:27 PM Time of restoration: 1:17 PM Affected areas: Sara S/S Feeder 1- Sara (portion) and San Dionisio, Iloilo Cause: Tree felled on the Primary Line due to cutting activities done by our MCO For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: May 30, 2024 Time of interruption: 5:20 AM Time of restoration: 6:01 AM Affected area: Culasi, Ajuy, Iloilo Cause: Line fault due to animal contact For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: May 29, 2024 Time of interruption: 3:43 PM Time of restoration: 4:20 PM Affected area: Maya, Balasan, Iloilo (portion) Activity: Installed additional distribution transformer For your information Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • ILOILO III ELECTRIC COOPERATIVE, INC. commemorates the Liberation of Panay, a celebration of freedom from oppression

    The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more