• UNSCHEDULED POWER INTERRUPTION (OCTOBER 11, 2022)

    Date: October 11, 2022 Time of interruption: 11:55 AM Time of Restoration: 12:05 PM Affected Area: Feeder 3 (Municipality of Batad) Reason/Activity: Vegetation contact with primary line @ Brgy. Lumbia, Estancia. Inspection/clearing of lines and replaced fuse link We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA OKTUBRE 13 KAG 17, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang Single Phase Line. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption sa banwa sang Estancia amo ang masunod: OKTUBRE 13, 2022 (HUWEBES)8:00 AM- 5:00 PM(9 ka oras ang kalawigon) OKTUBRE 17, 2022 (LUNES)8:00 AM- 1:00… Read more

  • CHANGE METER OF BIG LOAD CONSUMERS IN POBLACION, CONCEPCION

    ILECO III Technical personnel conducted change meter of the following big load consumers 1. Wet and Semi Wet Market 2. Concepcion Municipal Hall Gym at Poblacion, Concepcion today, October 10, 2022 (Monday). Keep safe Warriors of Light For your information. Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more