• UNSCHEDULED POWER INTERRUPTION (APRIL 25, 2023)

    Date: April 25, 2023 Time of interruption: 5:55 AM Time of restoration: 6:15 AM Affected areas: Brgy. Caw-i (portion) and Cabagohan, Iloilo Activity: Inspection of Three-Phase Line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA ABRIL 28, 2023 SA BRGY. DEL CASTILLO, SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 28, 2023 (BIYERNES), 8:00 AM-5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang Open Secondary pakadto sa Single Phase Line sa Brgy. Del Castillo, Sara, Iloilo. Ang apektado nga lugar sang sini nga power interruption amo ang:•… Read more

  • SCHEDULED POWER INTERRUPTION SA MAYO 6, 2023 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 06, 2023 (SABADO), 8:00 AM-5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang linya halin Vee- Phase Line pakadto sa Three-Phase kag Vee-Phase para sa pag-tap sang National Housing Authority (NHA) sa Brgy. Carmelo, Banate, Iloilo. Ang… Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more