• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 1, 2023)

    Date: February 01, 2023 (Wednesday) Time of interruption: 2:00 PM Time of restoration: 3:10 PM Affected area: Poblacion, Anilao, Iloilo (portion) Activity: Installed correctional pole We apologize for the inconvenience. For your information. Read more

  • THERMAL SCANNING OF DISTRIBUTION LINES

    ILECO III Technical Team conducted Thermal scanning of Distribution Lines to determine hotspots of distribution lines and to reduce system loss today, January 31, 2023 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 31, 2023)

    Date: January 31, 2023 Time of interruption: 11:30 AM Time of restoration: 3:25 PM Affected area: Trinidad Village, Poblacion, Barotac Viejo, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more