• EMERGENCY POWER INTERRUPTION SA BANWA SANG BALASAN SA ABRIL 30, 2024

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa ABRIL 30, 2024 (MARTES), 5:00 AM- 7:00 AM (2 ka oras ang kalawigon) para sa pagkay-o sang primary line sa Maya, Balasan. Ang lugar nga apektado sang sini nga power interruption amo ang masunod: Feeder 2- Balasan Substation • BALASAN (portion) •… Read more

  • POWER INTERRUPTION

    Date: April 23, 2024 (Wednesday) Time of interruption: 3:29 PM Estimated time of restoration: 4:04 PM Affected areas: Sitio Punta Iki, Culasi, Ajuy Activity: Splitting of secondary line and adding one (1) transformer due to low voltage For your information. Read more

  • EMERGENCY POWER INTERRUPTION

    Date: April 23, 2024 (Tuesday) Time of interruption: 5:00 AM Estimated time of restoration: 7:00 AM Duration: 2 Hours Affected areas: Feeder 2 of Balasan Substation Activity: Re-sagging of neutral wire in Brgy. Maya, Balasan, Iloilo For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more