
POWER RATES
POWER ADVISORIES
ILECO III Technical Team installed and energized 50 kVA private distribution transformer of NISU-Batad today, January 05, 2023. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-relocate sang mga Three-Phase Line, pag-disconnect kag pag-reconnect sang fuse cut-out. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SAN DIONISIO amo ang masunod: ENERO 08, 2023 (DOMINGO)8:00 AM- 9:00 AM (1 ka oras… Read more
Date: January 04, 2023 (Wednesday) Time of interruption: 9:23 AM Time of restoration: 9:45 AM Affected area: Toll House, San Lucas, Barotac Viejo, Iloilo Activity: Repaired damage neutral and secondary line We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more