
POWER RATES
POWER ADVISORIES
Date: December 3, 2022 (Saturday) Time of interruption: 2:00 PM Estimated Time of Restoration: 3:00 PM Cause of interruption: Troubleshooting of Banate Substation 15KV Mainbreaker due to malfunction of swithches. Affected areas: Municipalities of Anilao and Banate We apologize for the inconvenience. For your information. Read more
Date: December 03, 2022 (Saturday) Time of interruption: 10: 17 AM Time of restoration: 11: 18 AM Affected area: Whole Municipality of Anilao and Banate Cause of interruption: Main Breaker Trip Off We apologize for the inconvenience. For your information. Read more
ILECO III Technical Team installed private distribution transformer in Brgy. Malapaya, Sara, Iloilo today, December 02, 2022 (Tuesday). For your information. Read more
NEWS AND UPDATES
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more