
POWER RATES
POWER ADVISORIES
Date: October 28, 2022 Time of interruption: 6:13 PM Time of Restoration: 7:15 PM Affected Area: Balantian, Balasan Reason/Activity: Line fault due to heavy rain and lightning surge/ Inspection of line and replaced busted fuse link. We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more
Date: October 28, 2022 Time of interruption: 5:24 PM Time of Restoration: 6:48 PM Affected Area: Lawis, Balasan Reason/Activity: Line fault due to secondary jumper cut-off/ Repair secondary jumper cut-off and re-fusing We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more
ILECO III Technical personnel repaired the secondary jumper of the transformer loose connection at Brgy. Botongon, Estancia today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more
NEWS AND UPDATES
PAHIBALO SA MGA KATAPO-KONSUMIDORES Ang tanan nga individual consumers ang pwede makabayad sa mga masunod nga accredited payment centers:PAYMAYAECPAYLINK.BIZPORTALUNION BANKSEVEN ELEVENFIRST CONSOLIDATED BANK- ESTANCIA BRANCHGCASHBDO NETWORK BANK- ESTANCIA AND SARA BRANCHRD PAWNSHOPM LHUILLIERUNIFIED GPRSPALAWAN PAWNSHOPRURAL BANK OF ANILAO, INC.BDO UNIBANKRCBC Samtang ang tanan nga BAPA Members ang kinahanglan nga magbayad sa inyo natungdan nga BAPA.… Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins the biggest hour for Earth. EARTH HOUR! Let’s switch off later 8:30 PM – 9:30 PM, this will help Earth recover for our future. Read more
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more