• UNSCHEDULED POWER INTERRUPTION (APRIL 3, 2023)

    Date: April 03, 2023 Time of interruption: 11:50 AM Time of restoration: 2:33 PM Affected area: Banban, Batad, Iloilo Cause: Line fault due to animal contact (gecko) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA ABRIL 12-15 KAG 17, 2023

    Pahibalo sa mga katapo-konsumidores nga may serye sang SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang mga masunod: ABRIL 12, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)BAROTAC VIEJO• Sitio Tigbao, Nueva • Invencion ABRIL 13,… Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 1, 2023)

    DATE: April 01, 2023 Time of interruption: 6:14 PM Time of restoration: 7:29 PM Affected areas: Proper, Brgy. Cabalic, Balasan Activity: Replace secondary jumper cut-off We apologize for the inconvenience. For your information. Read more

  • MAGPAREHISTRO NA SA ATON 31ST AGMA

    ILOILO III ELECTRIC COOPERATIVE, INC. 31st VIRTUAL ANNUAL GENERAL MEMBERSHIP ASSEMBLY Link for Registration: https://forms.gle/1xEEg6uTxFaCxmhk9 https://forms.gle/aexZrv4zhbcBSn4X8 https://forms.gle/Wa8JXiYagacCoBcm6 Read more

  • ILECO 3 HOLY WEEK SCHEDULE

    PAHIBALO SA MGA KATAPU-KONSUMIDORES ILECO 3 Holy Week Schedule Read more

  • HAPPY BIRTHDAY DIRECTOR BELITA!

    Happy happy birthday to our dear Board of Director, Engr. Vincent H. Belita. Wishing you all the best in life and may God bless you always. From your ILECO III Family! Read more

  • LOOK: ILECO III CONDUCTED ANNUAL RECOLLECTION ACTIVITY FOR EMPLOYEES

    As part of the cooperative’s continued program to heighten employees’ spiritual growth, ILECO III conducted a Recollection Activity focusing on the topic “Season of Love and Holiness, How to Fight Evil during Lent” on April 01, 2023 (Saturday) at Dos Pharma Residence in San Dionisio, Iloilo. The resource speaker for this recollection was Rev. Father… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more