• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 11:10 AM Estimated time of restoration: 1:25 PM Affected area/s: Proper, Brgy. Bagacay, San Rafael Activity: Inspection and replaced damaged transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 7:44 AM Estimated time of restoration: 8:50 AM Affected area/s: Brgy. Dapdapan and Cabantohan, Lemery Activity: Inspection/repaired sectionalizing cut-out of Phase C located at Brgy. Arante and replaced busted fuse link due to heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 12:05 NN Estimated time of restoration: 1:27 PM Affected area/s: Brgy. Ferraris, Sara Activity: Inspection/repaired sectionalizing cut-out and replaced busted fuse link and fuse tube at Brgy. Ferraris, Sara due to Phase C trip-off. We apologize for the inconvenience. For your information. Read more

  • GOOD FRIDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Good Friday, April 07, 2023 Read more

  • MAUNDY THURSDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Maundy Thursday, April 06, 2023 Read more

  • MAGPAREHISTRO NA SA ATON 31ST AGMA

    ILOILO III ELECTRIC COOPERATIVE, INC. 31st VIRTUAL ANNUAL GENERAL MEMBERSHIP ASSEMBLY Link for Registration: https://forms.gle/1xEEg6uTxFaCxmhk9 https://forms.gle/aexZrv4zhbcBSn4X8 https://forms.gle/Wa8JXiYagacCoBcm6 Read more

  • ILECO 3 HOLY WEEK SCHEDULE

    PAHIBALO SA MGA KATAPU-KONSUMIDORES ILECO 3 Holy Week Schedule Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more