• UNSCHEDULED POWER INTERRUPTION (JULY 1, 2023)

    Date: July 01, 2023 Time of interruption: 6:00 AM Time of restoration: 8:00 AM Affected area: Hacienda Rica, Badiang, Anilao, Iloilo Action taken: Line inspection and re-facing pin insulator due to animal contact We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTIONS SA HULYO 20-22, 2023 SA BANWA SANG ANILAO

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang ANILAO amo ang masunod: HULYO 20, 2023 (HUWEBES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Sitio Litik, Poblacion HULYO 21, 2023 (BIYERNES)8:00… Read more

  • SCHEDULED POWER INTERRUPTIONS SA HULYO 10-15 KAG 17-18, 2023 SA BANWA SANG BAROTAC VIEJO

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO ang masunod: HULYO 10, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sitio Pabillar, San Roque HULYO 11,… Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more