• Causes of unscheduled power interruptions occurred on ILECO III coverage area

    For your information. Sara Area Coverage – July 28 – August 2, 2022 Natividad Area Coverage – July 28 – August 2, 2022 Pani-an Area Coverage – July 27 – 31, 2022 Read more

  • SCHEDULED POWER INTERRUPTION SA AGOSTO 11-12, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-convert kag pag-construct sang Single Phase Line. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: AGOSTO 11, 2022 (HUWEBES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Sua, San Dionisio• Tiabas, San Dionisio•… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 2, 2022)

    Date: August 02, 2022 Time of interruption: 10:15 AM Time of restoration: 1:12 PM Affected areas: Del Pilar and General Luna, Barotac Viejo, Iloilo Activity: Replaced rotten pole and re-sagging of Single Phase Line We apologize for the inconvenience. For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • NATIONAL ELECTRICAL SAFETY MONTH

    ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more

  • Ngaa may power interruption?

    Read more

  • ILECO III FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more