
POWER RATES
POWER ADVISORIES
LOOK: ILECO III Technical Team installed 37.5 KVA in Cubay, San Dionisio, Iloilo today, January 27, 2023. Keep safe Warriors of Light! For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa PEBRERO 04, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1 ka oras ang kalawigon)KAG5:00 PM-… Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag pull-out sang mga existing poles, pay-out kag stringing sang mga conductors Sa Double Circuit Line sang Banate Substation sa Brgy. Carmelo, Banate. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang… Read more
NEWS AND UPDATES
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins in celebrating National Electrical Safety Month 2023. Read more
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more