• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 15, 2022)

    Date: September 15, 2022 Time of interruption: 8:00 AM Time of Restoration: 9:40 AM Affected Area: Sitio Daga Bagacay, San Dionisio, San Rafael Activity: Inspection of line and replaced fuselink due to animal contact (bat) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 19, 29 KAG 30, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-ilis sang poste, pag-convert kag pag-construct sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARSETYEMBRE 19, 2022 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • SCHEDULED POWER INTERRUPTIONS SA SETYEMBRE 17, 19 KAG 20, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 4:00 PM(8 ka oras ang kalawigon)• Sitio Lo-ong Bukid, Lo-ong, Concepcion SETYEMBRE 19, 2022 (LUNES)8:00… Read more

  • FIRE SAFETY TIP

    Avoid overloading of outlets. Read more

  • A MOTHER’S DAY TREAT!

    A mother’s love is the light that guides. In celebration of Mother’s Day, ILECO III pays tribute to all mothers for their love, care and sacrifices for their family. The cooperative facilitated Pampering Day to our loving mothers by giving them Free Haircut, Manicure and Pedicure on May 12, 2023 in ILECO III Area Offices.… Read more

  • HAPPY MOTHER’S DAY

    We all wish all the mother’s all the best in life as they celebrate motherhood. We Love You! Read more

  • REQUIREMENTS FOR CHANGE OF NAMEDECEASED MEMBER CONSUMER

    1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after on the… Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more