
POWER RATES
POWER ADVISORIES
SARA SUBSTATION BANATE SUBSTATION DAAN BANWA AJUY SUBSTATION NATIVIDAD SUBSTATION was de-energized due to NGCP shutdown. ILECO III Technical Team is still closely coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. Power restoration to affected areas is not yet determined. We apologized for the… Read more
Power were restored in: ANILAOBANATEBAROTAC VIEJOSAN RAFAEL Additional power restored in: SAN DIONISIOLEMERY PORTION OF SARA While Daan Banwa Substation Feeder 1 was de-energized at around 11:19 PM due to Manual Load Dropping. Power restoration to affected areas is not yet determined. ILECO III Technical Team is still closely coordinating with National Grid Corporation of… Read more
Date: April 28, 2023 (Friday) Time of interruption: 11:19 PM Affected areas: Feeder 1-Daan Banwa Substation TIME OF POWER RESTORATION: NOT YET DETERMINED For your information. Read more
NEWS AND UPDATES
Keep flammable items away from children. Read more
An Information Education Campaign (IEC) Activity was conducted by Northern Iloilo State University (NISU)-Department of Energy and Affiliated Renewable Energy Center (AREC) in coordination with ILECO III and LGU-Batad on May 16, 2023 in Batad, Iloilo. Atty. James G. Balsomo II was the Resource Speaker of the said IEC highlighting the following topics: Renewable Energy… Read more
ILECO III accepted the Certificates for ISO 9001:2015 QMS from DQS Certification Phils., Inc. and IQNET LTD on May 16, 2023. The virtual awarding was attended by ILECO III Board of Directors headed by Board President Villa B. Gumban and Management Committee headed by General Manager, Atty. James G. Balsomo II. Being an ISO means… Read more
Keep safe Warriors of Light! Power On! For your information. Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more