• EMERGENCY POWER INTERRUPTION (AUGUST 15, 2022)

    Date: August 15, 2022 Time of interruption: 9:42 AM Time of Restoration: 3:00 PM Affected Area: Sitio Ga-on, Brgy. Bato Biasong, Ajuy Activity: Pole hauling and erection of pole replacement of damage/rotten pole We apologize for the inconvenience. For your information. P.S We are grateful to Brgy. Captain Asturias and officials of the said barangay… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 18, 2022)

    Date: August 18, 2022 Time of interruption: 9:04 AM Time of Restoration: 10:10 AM Affected Area: Tabugon Island, Carles Cause of Interruption: Transient line fault Activity: Inspection of lines and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 18, 2022)

    Date: August 18, 2022 Time of interruption: 8:15 AM Time of Restoration: 9:05 AM Affected Area: Sitio Lampuyang, Sitio Danmar and Sitio Bacolod, Libertad, Banate Cause of Interruption: Line fault due to animal contact (bat) Activity: Inspection/clearing of lines and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more