• EMERGENCY POWER INTERRUPTION (NOVEMBER 1, 2022)

    Date: November 1, 2022 Time of interruption: 8:12 AM Time of Restoration: 8:42 AM Affected Area: Whole Feeder 1 of Sara Substation (Brgys of Sara and San Dionisio) Afftected Areas: Sara Substation (Feeder 1)Sara: Aldeguer and Castor (Portion)San Dionisio: Dugman, Tuble, San Nicolas, Cudionan, Had. Conchita, Sua, Tiabas, Cubay, Bagacay, Agdaliran, Borongon, Manduawak, Talo-ato, Batuan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 31, 2022)

    Date: October 31, 2022 Time of interruption: 8:55 PM Time of Restoration: 9:15 PM Affected Area: NHA Village, Magdalo, Banate Reason/Activity: Line fault due to damage of secondary bushing/ Inspection and repaired damaged secondary bushing. We apologize for the inconvenience. For your information. Read more

  • TROUBLESHOOTING OF FEEDER 1 LINE FAULT SUSPENSION INSULATR CENTER PHASE C8 IN DEVERA, SARA

    ILECO III Technical personnel troubleshoot Feeder 1 line fault suspension insulator center phase C8 at Brgy. Devera, Sara, today October 31, 2022 (Monday). Keep safe Warriors of Light For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more