
POWER RATES
POWER ADVISORIES
Date: November 7, 2023 (Tuesday) Time of interruption: 5:08 AM Estimated time of restoration: 5:39 AM Affected areas: Inventor All Barangays of Municipality of Lemery and Portion of Sara (Arante, Apelo and Villahermosa) Activity: Inspection of primary line then pulled out duplex wire interfering primary line at Brgy. Velasco, Lemery and replaced busted fuse link. Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 8, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang poste nga apektado sang DPWH widening project. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod:• Ardemil• Read more
Date: November 6, 2023 (Monday) Time of interruption: 6:01 PM Estimated time of restoration: 6:33 PM Affected areas: Inventor St., Poblacion, Estancia Activity: Inspection and repaired secondary jumper loose connection of private transformer. We apologize for the inconvenience. For your information. https://www.facebook.com/watch/?v=1048619722843125 Read more
NEWS AND UPDATES
Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF sang gina-ayo nga pahanugot para sa Aplikasyon sang Confirmation and Approval of Calculations of Over or Under Recoveries in the Implementation of Automatic Cost Adjustments Read more
Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in Read more
Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in Read more
Sa palaabuton nga Marso 27, 2025 alas 9 sang aga, may pagatigayunon nga Virtual Hearing ang Energy Regulatory Commission (ERC). Ini kabahin sa ginpasar nga ERC Case No. 2024-017 CF nahanungod sa aplikasyon sang Iloilo III Electric Cooperative, Inc. (ILECO III) para sa pag kumpirma kag pahanugot sang Calculations of Over or Under Recoveries in Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more