• ANG SCHEDULED POWER INTERRUPTION SA OKTUBRE 14, 2023 GIN-RESCHULE SA OKTUBRE 15, 2023

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa OKTUBRE 14, 2023 (SABADO) ang GIN-RESCHEDULE sa OKTUBRE 15, 2023 (DOMINGO), 6:00 AM- 3:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang steel pins. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions… Read more

  • SCHEDULED POWER INTERRUPTIONS SA OKTUBRE 14 KAG 18-20, 2023 SA BANWA SANG BAROTAC VIEJO

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: OKTUBRE 14, 2023 (SABADO)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Sto. Tomas OKTUBRE 18, 2023 (MIYERKULES)8:00… Read more

  • SCHEDULED POWER INTERRUPTION SA OKTUBRE 16-17, 2023 SA BANWA SANG SAN RAFAEL

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SAN RAFAEL amo ang masunod: OKTUBRE 16, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Sitio Balakbakan, San Andres OKTUBRE 17,… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more