
POWER RATES
POWER ADVISORIES
“Visayas grid status, 29 April 2023: At 8:54 AM, NGCP monitored a disturbance. Multiple power plants in Panay disengaged from the transmission system. Parts of the franchise areas of AKELCO , CAPELCO, ANTECO, MORE Power, ILECO I, ILECO II, and ILECO III lost power. NGCP is investigating the root cause of the system disturbance and… Read more
Ang aton mga substations nga na energize ang nag-off line sa liwat subong alas 9:08 a.m. bangud sang pag-tripping sang planta sang PEDC nga nagdulot sang unstable nga supply sang kuryente sa bug-os nga Panay power grid. Sara Substation- De-Energized Ajuy Substation – De-Energized Banate Substation -De-Energized Balasan Substation -De-Energized Daan Banwa Substation – Not… Read more
Nag abiso ang PEDC nga nagtripped and ila nga unit 1 & 3 kag yara na sa under investigation ang status sang ila nga mga planta alas 2:39 kagina sang kaagahon. Nag paguwa naman sa liwat ang PEDC sang update alas 6:00 kagina sang aga nga nasynchronize na nila liwat ang Unit 1 nila ng… Read more
NEWS AND UPDATES
Through the efforts of Dir. Vincent H. Belita (Board of Director- District III, San Dionisio and Concepcion), ILECO III turned-over twenty (20) mono block chairs to San Isidro Chapel in Brgy. Mandu-awak, San Dionisio, Iloilo last June 09, 2022 (Friday). Ms. Yolanda Carique happily accepted the donations and extended her gratefulness to ILECO III for… Read more
HAPPY BIRTHDAY HON. MA. THERESA F. DEBUQUE, VICE MAYOR OF ANILAO, ILOILO. From ILECO III Family! Read more
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more
(REPUBLIC ACT 11361) ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution… Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more