• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED POWER INTERRUPTION sang ILECO III subong nga adlaw, MAYO 14, 2026 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert kag pag-clearing sang linya, pag-ilis sang steel pins kag pagpatigayon sang iban pa nga technical activities. Ang lugar nga apektado sang sini nga… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 22, 2026 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang masunod: • Aglosong Madamo gid nga salamat sa… Read more

  • NGCP’s EMERGENCY POWER ADVISORY

    What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more