• ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 09, 2025 (Friday) Time of power interruption: 6:02 PM Estimated time of power restoration: 6:32 PM Duration: 30 minutes Cause: Repair of damaged primary jumper cut-off Affected areas: Municipality of Sara Aguirre Antonio Yusay/PasigApologista (Portion) Aspera Ardemil Bato Del Castillo Domingo Juaneza Latawan Malapaya MuycoPoblacion Ilaya Poblacion Market Poblacion Ilawod Tady For your Read more

  • ILECO III EMERGENCY POWER INTERRUPTION

    Date: May 07, 2025 (Wednesday) Time of power interruption: 8:30 PM Estimated time of power restoration: 9:30 PM Duration: 1 hour Cause: Repair of damaged cut-out assemble center phase Affected areas: Santol, Bondulan, Poblacion, Siempreviva, Pase and Capinang, San Dionisio Aglosong and portion of Bacjawan Norte, Concepcion For your information. Read more

  • REPOSTING POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga GINSAYLO ANG ORAS sang SCHEDULED PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa MAYO 03, 2025 (SABADO). Ang BAG-O NGA ORAS kag apektado nga lugar sang sini nga power interruption amo ang masunod: MAYO 03, 2025 (SABADO) Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more