• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022 Time of interruption: 4:10 PM Time of Restoration: 4:55 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Phase A from Brgy. Batad Viejo to Caw-i, Batad We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022 Time of interruption: 3:50 PM Time of Restoration: 4:20 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Seaside Gasoline Station, Estancia (Private Transformer) We apologize for the inconvenience. For your information. Read more

  • Update on Unscheduled Power Interruption on Sara Feeder 1

    Time Restored: 7:18 PM Cause of Interruption: Line fault due to vegetation (Coconut Tree was leaning on our Primary Line located at Brgy. Devera, Sara. Thank you for your understanding. Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more