• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 23, 2022)

    Date: November 23, 2022 Time of interruption: 6:03 AM Time of Restoration: 6:26 AM Cause of interruption: Line fault due to animal contact at primary line Affected areas: Portion of Brgy. Binon-an to Brgy. Tanao, Batad We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SARA SA NOBYEMBRE 25, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 25, 2022 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod: • Poblacion Ilawod• Sitio Mabang… Read more

  • EMERGENCY POWER INTERRUPTION SA NOBYEMBRE 24, 2022

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III para sa pag-construct sang Double Circuit Line halin sa Poblacion, Banate pakadto sa Carmelo, Banate para sa pag-energize sang Banate Substation. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang amo ang masunod: PETSA,ORAS KAG APEKTADO NGA… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more