• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA ENERO 7, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa ENERO 07, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 4:00 AM- 5:00 AM (1 ka oras ang kalawigon)KAG5:00 PM-… Read more

  • UNSHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 (Monday) Time of interruption: 10:42 AM Time of restoration: 11:52 AM Affected area: Sitio Piliwan, Luca, Ajuy, Iloilo Activity: installation of 25 KVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 Time of interruption : 6:05 AM Time restored : 6:50 AM Affected area : Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity : Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more