• SCHEDULED POWER INTERRUPTION SA MAY 23-27 KAG 29, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya kag pag-patigayon sang technical activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: MAY 23, 2023 (MARTES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 18, 2023)

    Date: May 18, 2023 (Thursday) Time of interruption: 12:15 PM Time of restoration: 12:58 PM Affected area: Alinsolong, Ban-Ban and Binon-an, Batad Activity: Inspection of V-Phase line and replace busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 18, 2023)

    Date: May 18, 2023 (Thursday) Time of interruption: 9:55 AM Time of restoration: 10:18 AM Affected area: P.M Garin Building, Esdams St., Poblacion, Estancia Activity: Inspection of line and replace busted fuse link (Private Transformer) We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more