• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • FIRE SAFETY TIP

    Dispose cigarette butts properly. Read more

  • FIRE SAFETY TIP

    Never leave your kitchen unattended while cooking. Read more

  • HOLIDAY ADVISORY

    NOTICE TO THE PUBLIC Pahibalo sa mga katapo-konsumidores nga ang AGOSTO 21, 2023 (LUNES) ang gin-deklara nga SPECIAL NON-WORKING HOLIDAY sa bug-os nga pungsod para sa pag-obserba sang NINOY AQUINO DAY kag ang AGOSTO 28, 2023 (LUNES) ang gin-deklara nga REGULAR HOLIDAY para sa pag-selebrar sang NATIONAL HEROES DAY. Ari ang masunod nga ILECO III… Read more

  • FIRE SAFETY TIP

    Read more