
POWER RATES
POWER ADVISORIES
Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more
What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more
ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more
NEWS AND UPDATES
1. Patyon ang Main Switch kung nagabaha na sa inyo lugar.2. Indi pagtandugon ang mga basa nga wirings sang kuryente.3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga.4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited barangay electrician para… Read more
ILECO III successfully conducted Information Education Campaign (IEC) and Gift-giving Activity to 38 BAPA members in Sitio Linusot, Poblacion, San Rafael, Iloilo on August 23, 2023 (Wednesday). The said meeting was attended and headed by NAO-Branch Operation Service Chief Ms. Ma. Angela P. Resano and assisted by other ILECO III personnel. This is one of… Read more
ILECO III successfully conducted Feeding Program and Gift-giving Activity to 50 kids in Pantalan, Anilao, Iloilo on August 23, 2023 (Wednesday). This is in coordination with Catholic-Women’s League-Anilao Chapter, Pantalan Brgy. Officials and ILECO III. It was attended by Dir. Lanie J. Velasco, Board of Director of ILECO III, Former ILECO III General Manager Consorcia… Read more
Regularly check electrical wires for damage. Replace it immediately. Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more