• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    Read more

  • PRESS RELEASE

    Western Visayas Electric Cooperatives deliver relief with significant decrease in Electricity Rates; ILECO 3 has lowest electricity rate across the region Western Visayas, September 25, 2023 – In a welcome turn of events for residents and businesses in the Western Visayas region, the cost of electricity is seeing a significant decrease, with ILECO 3 leading… Read more

  • NOTICE TO THE PUBLIC

    Pahibalo sa mga katapo-konsumidores nga ang ILECO III ang naga-selebrar sang ika 37th FOUNDING ANNIVERSARY sa Setyembre 26, 2023 (Martes). Bangud sini, SARADO ang ILECO III Main Office kag AREA OFFICES (SARA, NATIVIDAD kag PANI-AN) sa nasambit nga adlaw. Apang may ara sang assigned on duty maintenance crew sa Coverage Area sang ILECO III para… Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig. Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more