
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 22, 2026 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang masunod: • Aglosong Madamo gid nga salamat sa… Read more
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time: Extended beyond 10:00 PM (or until the Visayas power grid becomes stable) Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines… Read more
What: Rotational Brownout because of load shedding within ILECO III Area Coverage Date: May 13, 2026 (Wednesday) Time within 4:00 PM- 8:00 PM Areas Affected : ILECO III Area Coverage Cause of Power Interruption: Load Shedding due to manual load dropping of National Grid Corporation of the Philippines (NGCP) This rotational brownout due to manual… Read more
NEWS AND UPDATES
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
From ILECO III Family! Read more
BIDS AND NOTICES
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more