• UNSCHEDULED POWER INTERRUPTION (JULY 26, 2022)

    Date: July 26, 2022 Time of interruption: 10:13 AM Time of restoration: 12:42 AM Affected area: Sitio Baklayan, Puerto Princesa, Barotac Viejo, Iloilo Activities: Installation of additional distribution transformer and load splitting We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 26, 2022)

    Date: July 26, 2022 Time of interruption: 9:10 AM Time of restoration: 9:26 AM Affected area: Purok Tanigue, Pa-on, Estancia, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 26, 2022)

    Date: July 26, 2022 Time of interruption: 3:56 AM Time of restoration: 4:49 AM Affected area: Sitio Bantud, Carmelo, Banate, Iloilo Cause: Line fault due to animal contact (gecko) Activities: Inspection of line and pulled-out gecko We apologize for the inconvenience. For your information. Read more

  • COMELEC PRECINCT FINDER

    Read more

  • FIRE SAFETY TIP

    Avoid overloading of outlets. Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo-konsumidor sang ILECO III nga yari ang detalye sang mga numero nga puwede ninyo matawgan o mahatagan sang mensahe nahanungod sa brownout sa ti-on sang aton nga palaabuton nga Barangay and Sangguniang Kabataan Elections 2023 (BSKE 2023). Makig-angot lang sa aton mga Technical Personnel nga na assigned sa inyo nga banwa para… Read more

  • LOOK: ILECO III NAGPATIGAYON SANG BLOOD-LETTING ACTIVITY KAUPOD ANG PHILIPPINE RED CROSS- ILOILO CHAPTER

    Kabahin sa pagsaulog sang National Cooperatives’ Month kag 37th Foundation Day Celebration, ang Iloilo III Electric Cooperative, Inc. (ILECO III ) kaupod ang Philippine Red Cross – Iloilo Chapter ang madinalag-on nga nagpatigayon sang Blood Letting Activity “Give blood, give plasma, share life, share often” sang Oktubre 25, 2023 (Miyerkules). May ara sang 74 ka… Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more