• EMERGENCY POWER INTERRUPTION (SEPTEMBER 1, 2023)

    Date: September 1, 2023 (Friday) Time of interruption: 7:00 AM Time of Restored: 7:30 AM Activity: Inspection of line and re-fusing primary cut-out. Affected areas: Poblacion, Barotac Viejo We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (AUGUST 31, 2023)

    Date: August 31, 2023 (Thursday) Time of interruption: 9:42 AM Time of Restored: 11:45 AM Activity: Replaced rotten pole and clearing of lines Affected areas: Purok 3, Nalumsan, Carles We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (AUGUST 30, 2023)

    Date: August 30, 2023 (Wednesday) Time of interruption: 6:06 PM Time of Restored: 7:51 PM Activity: Inspection of line and clearing due to vegetation (bamboo leaning towards secondary and neutral line Affected areas: Sitio Camansi, Cabalic, Balasan We apologize for the inconvenience. For your information. Read more

  • COMELEC PRECINCT FINDER

    Read more

  • FIRE SAFETY TIP

    Avoid overloading of outlets. Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo-konsumidor sang ILECO III nga yari ang detalye sang mga numero nga puwede ninyo matawgan o mahatagan sang mensahe nahanungod sa brownout sa ti-on sang aton nga palaabuton nga Barangay and Sangguniang Kabataan Elections 2023 (BSKE 2023). Makig-angot lang sa aton mga Technical Personnel nga na assigned sa inyo nga banwa para… Read more

  • LOOK: ILECO III NAGPATIGAYON SANG BLOOD-LETTING ACTIVITY KAUPOD ANG PHILIPPINE RED CROSS- ILOILO CHAPTER

    Kabahin sa pagsaulog sang National Cooperatives’ Month kag 37th Foundation Day Celebration, ang Iloilo III Electric Cooperative, Inc. (ILECO III ) kaupod ang Philippine Red Cross – Iloilo Chapter ang madinalag-on nga nagpatigayon sang Blood Letting Activity “Give blood, give plasma, share life, share often” sang Oktubre 25, 2023 (Miyerkules). May ara sang 74 ka… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more