• POWER RESTORATION IN BRGY. CUBAY, SAN DIONISIO

    ILECO III conducted power restoration of Three (3) units of 25kVA Transformer of NSDMPC at Brgy. Cubay, San Dionisio, Iloilo today, January 12, 2023. For your information. Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA ENERO 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA TR1 sa Concepcion Substation sa ENERO 15, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:4:00 AM- 5:00 AM (1 ka oras ang… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 10, 2023)

    Date: January 10, 2023 Time.of interruption: 8:09 PM Time of restoration: 8:43 PM Affected area: St. Therese Village, Dayhagan, Carles, Iloilo Activity: Repaired secondary neutral bushing loose connection of transformer We apologize for the inconvenience. For your information. Read more

  • WEATHER ADVISORY

    PAHIBALO SA TANAN NGA ILECO III MEMBER-CONSUMER-OWNERS Bangud sang mabaskog nga pag-ulan, gina-abisuhan ang tanan sa posible nga unscheduled power interruptions nga maga-luntad sa franchise coverage sang ILECO III. Para sa pag-report sang mga power interruptions kag iban pa nga impormasyon nahanungod sa electric service, palihog makipag-angut sa aton Area Offices pina-agi sa pagpadala sang… Read more

  • ILECO III PAYMENT CENTERS

    Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT

    Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more