
POWER RATES
POWER ADVISORIES
Time of interruption: 6:28 p.m.Estimated time of restoration: Not yet determined Affected Areas: Municipalities of ANILAO, BANATE, BAROTAC VIEJO and SAN RAFAEL Cause of interruption: Load shedding of the transmission provider, National Grid Corporation of the Philippines (NGCP) Our Technical Team is closely coordinating with NGCP for the updates and estimated time of power restoration. Read more
Time of interruption: 1:28 p.m.Estimated time of restoration: Not yet determined Affected Areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, SARA, SAN DIONISIO, CONCEPCION, AJUY, LEMERY, BATAD, ESTANCIA, BALASAN, and CARLES Cause of interruption: High system voltage of Panay Grid transmission line operated by the National Grid Corporation of the Philippines (NGCP) Read more
For your information. Read more
NEWS AND UPDATES
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more