
POWER RATES
POWER ADVISORIES
ILECO III Technical Team is still coordinating with National Grid Corporation of the Philippines (NGCP) and power suppliers for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
DATE: April 27, 2022 (Thursday)Time of interruption: 1:53 PMEstimated Time of power restoration: NOT YET DETERMINED Affected areas: ILECO III Coverage Area (Sara, Lemery, Ajuy, San Dionisio, Concepcion, Batad, Estancia, Balasan, Carles, Anilao, Banate, Barotac Viejo and San Rafael) Cause of interruption: Over voltage of transmission line of NGCP caused by tripping of power generation Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing sang linya (backbone kag lateral lines), Pag-relocate sang Single Phase Line kag Replacement sang gabok nga mga poste. Ang oras, petsa kag apektado nga mga lugar sang sini nga power interruption amo ang masunod: ABRIL 29, 2023 (SABADO)8:00 Read more
NEWS AND UPDATES
From ILECO III Family! Read more
APRIL 12, 2025 (SATURDAY), 9:00 AM • ILECO III Gymnasium, Brgy. Preciosa, Sara, Iloilo • Balasan Civic Center, Brgy. Poblacion Sur, Balasan, Iloilo • Barotac Viejo Municipal Gymnasium, Brgy. Poblacion, Barotac Viejo, Iloilo “Beyond Power: Electric Cooperatives Empowering Communities, Changing Lives” Read more
From ILECO III Family! Read more
Last April 3, 2025, the SAO BAPA Area Assembly was successfully held at ILECO III Gymnasium, Brgy. Preciosa, Sara. The assembly was graced by Hon. Raul “Boboy” C. Tupas, Representative, 5th District of Iloilo and Hon. Binky April M. Tupas, Board Member, 5th District of Iloilo as the Guest Speakers who shared valuable insights with Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more