• SCHEDULED LOAD TRANSFER OF NGCP ON APRIL 9, 2022

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Panitan-Sara Transmission Line sa ABRIL 09, 2022 (SABADO), 6:00 AM- 8:00 AM(2 ka oras ang kalawigon) kag 4:00 PM- 6:00 PM (2 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang… Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 5, 2022)

    Date: April 5, 2022 (Tuesday)Time of interruption: 12:15 PMTime of restoration: 2:50 PMAffected area: Sitio Hambad, Vista Alegre, Barotac Viejo, IloiloActivity: Pole relocationWe apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION TODAY, APRIL 5, 2022

    Date: April 5, 2022 (Tuesday)Time of interruption: 10:00 AMTime of restoration: 11:31 AMAffected area: Calangag, Batad, IloiloActivities: Repaired of secondary jumper loose and correction of leaning poleWe apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more