• UNSCHEDULED POWER ADVISORY (JUNE 7, 2023)

    Date: June 07, 2023 Time of interruption: 5:10 AM Time of restoration: 5:59 AM Affected area: Dungala-an, Anilao, Iloilo Activities: inspection of secondary line due to transformer cut out trip off and replaced busted fuse link We apologize for the inconvenience. Thank you. Read more

  • SCHEDULED POWER INTERRUPTION SA HUNYO 10, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 10, 2023 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya, relocation kag construction sang Three-Phase Line sa Brgy. Poblacion kag Luca, Ajuy, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa banwa… Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 6, 2023)

    Date: June 06, 2023 Time of interruption: 8:29 AM Time of restoration: 9:53 AM Affected area: Brgy. Bagaygay, Tentay, San Luis and Improgo, Sara, Iloilo Activities: Replace damage cut-out assembly and transfer of Single Phase cut-out to the nearest pole. We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more