• UNSCHEDULED POWER INTERRUPTION (JUNE 26, 2023)

    Date: June 26, 2023 Time of interruption: 9:20 AM Time of restoration: 10:16 AM Affected area: Zerrudo, Sara, Iloilo Activities: Replaced cut-out and repaired distribution transformer loose connection We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 26, 2023)

    Date: June 26, 2023 (Monday) Time of interruption: 7:00 AM Time of restoration: 9:15 AM Affected areas: Lanciola, Crespo and Bakabak (portion), Sara, Iloilo Activity: Replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • KANSELADO ANG CORRECTIVE MAINTENANCE SANG NGCP SA HUNYO 25, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang CORRECTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 25, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: HUNYO 25, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka oras ang kalawigon)• ANILAO• BANATE•… Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more