• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 15, 2022)

    Date: September 15, 2022 Time of interruption: 8:00 AM Time of Restoration: 9:40 AM Affected Area: Sitio Daga Bagacay, San Dionisio, San Rafael Activity: Inspection of line and replaced fuselink due to animal contact (bat) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 19, 29 KAG 30, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-ilis sang poste, pag-convert kag pag-construct sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARSETYEMBRE 19, 2022 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • SCHEDULED POWER INTERRUPTIONS SA SETYEMBRE 17, 19 KAG 20, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 4:00 PM(8 ka oras ang kalawigon)• Sitio Lo-ong Bukid, Lo-ong, Concepcion SETYEMBRE 19, 2022 (LUNES)8:00… Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR SITIO ELECTRIFICATION PROGRAM (SEP) RECIPIENTS IN DEL CASTILLO, SARA, ILOILO

    ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 16 recipients of 2023 Sitio Electrification Program (SEP) of Sitio Palaspason A, Del Castillo, Sara, Iloilo on March 01, 2024 (Friday). The said meeting was also attended by BAPA Fed Officer Leah Jabagat. The National Electrification Administration (NEA) appropriated budget to electrify twenty seven (27)… Read more

  • Who’s the REMARKABLE woman that influences you the most?

    https://www.facebook.com/ILECO3/posts/pfbid02iNZ3mXEbHonR33M4WTTpj774qy1gtbm6U3Ug3nfscA1M5YJzahqUbnEGYa1ZcRfZl Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • 2024 NATIONAL WOMEN’S MONTH

    The ILOILO III ELECTRIC COOPERATIVE, INC. stands with all the women of today in celebrating the 2024 National Women’s Month with the Theme: “Lipunang Patas sa Bagong Pilipinas: Kakayahan ng Kababaihan, Patutunayan!”, March 1 – 31, 2024. In today’s modern world, women is power. They are leaders, innovators, and changemakers, shaping the course of history… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more