• Update on the ongoing unscheduled power interruption in Natividad Area Coverage as of 8:00 p.m.

    Ongoing repair of the 69kv Disconnect Switch of Natividad Substation is being conducted by our Technical Team. Time of power restoration is not yet determined. We apologize for the inconvenience. For your information, thank you. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 16, 2022)

    What: UNSCHEDULED POWER INTERRUPTIONDate: September 16, 2022 (Friday)Time of interruption: 6:53 PMTime of restoration: NOT YET DETERMINEDAffected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAELCause: Loose connection of 69kv disconnect switch of Natividad Substation Our Technical Team is currently troubleshooting the cause of this power interruption. We apologize for the inconvenience. For your information. Read more

  • INSTALLATION OF PRIVATE TRANSFORMER AND LINE CLEARING

    ILECO III Technical personnel conducted installation of private transformer and line clearing at Sitio Salong, San Lucas, Barotac Viejo today, September 15, 2022 (Thursday).(No Power Interruption) Keep safe Warriors of Light For your information. Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more