
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 14, 2025 (DOMINGO), 5:00 AM- 6:00 PM (13 ka oras ang kalawigon) para sa pag-install sang bag-o nga feeder line, pag-ilis sang steel pins, patigayunon nga Preventive Maintenance sa Sara Substation kag pag-clearing sang linya. Ang mga lugar nga apektado sang Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50MVA Transformer No. 2 sa Dingle Substation Line sa SETYEMBRE 13, 2025 (SABADO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: SETYEMBRE 13, 2025 (SABADO) 6:00 AM- 6:00 Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa SETYEMBRE 05, 2025 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-relocate kag pag-clearing sang linya Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang BALASAN amo ang mga masunod: Madamo gid nga salamat Read more
NEWS AND UPDATES
ILECO III DISTRICT ELECTION 2024 Pahibalo sa mga katapo-kunsomidor nga may patigayunon nga Pinili-ay sang Hunta Direktiba “District Election” sa District VII (Barotac Viejo kag San Rafael) sa Marso 17, 2024 (Domingo). Maga-sugod ang pagboto halin alas 8:00 sang aga tubtob alas 3:00 sa hapon sa mga masunod nga mga voting centers: Barotac Viejo : Read more
ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 5 recipients of 2023 Sitio Electrification Program (SEP) of Purok 6A, Pangi, San Dionisio, Iloilo on March 12, 2024 (Tuesday). The National Electrification Administration (NEA) appropriated budget to electrify twenty seven (27) sitios with 413 households within ILECO III area coverage for the year. This Read more
ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 10 recipients of 2023 Sitio Electrification Program (SEP) of Purok 3A, Madanlog, San Dionisio, Iloilo on March 12, 2024 (Tuesday). The National Electrification Administration (NEA) appropriated budget to electrify twenty seven (27) sitios with 413 households within ILECO III area coverage for the year. This Read more
ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 7 recipients of 2023 Sitio Electrification Program (SEP) of Purok 2A, Agdaliran, San Dionisio, Iloilo on March 12, 2024 (Tuesday). The National Electrification Administration (NEA) appropriated budget to electrify twenty seven (27) sitios with 413 households within ILECO III area coverage for the year. This Read more
BIDS AND NOTICES
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more
Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more
Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more