• UNSCHEDULED POWER INTERRUPTION (OCTOBER 2, 2023)

    Date: October 2, 2023 (Monday) Time of interruption: 8:09 AM Estimated time of restoration: 8:41 AM Affected Area/s: Smart Tower, Tanza, Estancia (Private) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 28, 2023)

    Date: September 28, 2023 (Thursday) Time of interruption: 8:00 AM Estimated time of restoration: 9:42 AM Affected Area/s: Portion of NHA Village, Calapdan, Estancia Activity: Replaced damaged distribution transformer (25kVA) We apologize for the inconvenience. For your information. Read more

  • MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA OKTUBRE 1, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREMENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 1 sa Concepcion Substation sa OKTUBRE 01, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: OKTUBRE 01, 2023 (DOMINGO)5:00 AM- 7:00 AM (2… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2025.

    For your information. Read more

  • Aton hibalu-on ang Power Bill kag Rate Composition

    Ka MCO! Aton hibalu-on ang Power Bill kag Rate Composition nga aton makita sa aton Power Bill kada bulan. Diin bala naga-kadto ang aton ginabayaran sa aton kuryente? Matuod gid man bala ang tsismis nga ang isa ka Electric Cooperative ang nagapa-gusto lang sa pag-pasaka sang kuryente? Diri naton mahibaluan kung fixed bala ang Distribution,… Read more

  • PUBLIC ADVISORY HOLIDAY NOTICE

    LABOR DAY – MAY 1, 2025 (THURSDAY) MAIN OFFICE AND AREA OFFICES – CLOSED ASSIGNED MAINTENANCE CREW ARE AVAILABLE AT AREA OFFICES TO ADDRESS YOUR CONCERNS/ COMPLAINTS. REGULAR OFFICE HOUR WILL RESUME ON MAY 2, 2025 (FRIDAY) MADAMO GID NGA SALAMAT SA INYO PAGHANGUP. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more