• KANSELADO ANG SCHEDULED POWER INTERRUPTION SUBONG NGA AGA SETYEMBRE 12, 2022

    Pahibalo sa mga katapo-konsumidores nga KASELADO ang SCHEDULED POWER INTERRUPTION sang ILECO III para sa pag-replace sang mga rotten poles sa Brgy. CapiƱahan, Lemery subong nga aga Setyembre 12, 2022 alas 8:00 AM tubtob alas 5:00 PM. Madamo guid nga salamat sa inyo paghangup. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 7:21 PM Time of Restoration: 7:44 PM Affected Area: Binon-an, Alinsolong and Ban-Ban, Batad Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 7:21 PM Time of Restoration: 7:44 PM Affected Area: Binon-an, Alinsolong and Ban-Ban, Batad Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more